Question 54 of 58 in Work and Power

Work and Power

6 marks · Normal

A construction worker lifts a toolbox of mass 12 kg vertically upwards at a steady speed through a height of 2.5 m in 5 seconds.

(a)

Calculate the work done by the worker in lifting the toolbox.

[2 marks]
(b)

State the relationship between work done and energy transferred in this process.

[1 mark]
(c)

Calculate the power output of the worker while lifting the box.

[3 marks]

Work this out on paper, then compare with the answer and worked solution below. With a free account you can submit written answers for marking.

Show answer

(a) 300 J

(b) Work done is equal to the energy transferred.

(c) 60 W

Common mistakes: Using mass instead of weight for force; Dividing by wrong time interval; Confusing units

Show mark scheme and worked solution

Marking points

M1 (a) · 1 mark · Correct formula: W = F × d or W = mgh used

A1 (a) · 1 mark · Correct numerical work done (accept rounding of 300 J) (follow-through)

B1 (b) · 1 mark · States work done is equal to energy transferred

M2 (c) · 1 mark · Uses P = W/t with correct values (allow ft from (a)) (follow-through)

A2 (c) · 2 marks · Correct power output in W, accept 60 W with rounding; must include units (follow-through)

Worked solution

a) First, calculate the force (weight):

Work done:

b) The work done on the toolbox is equal to the energy transferred to it.

c) Power output is calculated by dividing work by time:

Report a problem with this question