SubjectCover

Question 53 of 58 in Work and Power

Work and Power

4 marks · Easy

A small elevator with total weight rises vertically in at a constant speed.

(a)

Calculate the work done by the elevator motor to raise the elevator.

[1 mark]
(b)

State the increase in gravitational potential energy (GPE) of the elevator.

[1 mark]
(c)

Calculate the power output of the elevator motor during the lift.

[2 marks]

Work this out on paper, then compare with the answer and worked solution below. With a free account you can submit written answers for marking.

Show answer

(a) 7500 J

(b) 7500 J

(c) 375 W

Common mistakes: Confuses weight with mass; Incorrect formula for power

Show mark scheme and worked solution

Marking points

A1 (a) · 1 mark · Work done = 1500 N × 5 m = 7500 J.

B1 (b) · 1 mark · Increase in GPE = work done = 7500 J. (follow-through)

M1 (c) · 1 mark · Uses power = work / time.

A2 (c) · 1 mark · Calculates correctly: 7500 J / 20 s = 375 W. (follow-through)

Worked solution

a) Work = force × distance = 1500 N × 5 m = 7500 J.

b) GPE increases by the same amount: 7500 J.

c) Power = work / time = 7500 J ÷ 20 s = 375 W.

Report a problem with this question
What's wrong?